Customization: | Available |
---|---|
Type: | Chain Bucket Mining Dredger |
Power Type: | Electric |
Still deciding? Get samples of US$ 2000/Set
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Chain bucket gold dredger . throuth the electric motor to drive chain bucket dig the mixture of sand .mud . stone and gold. then the bucket put mixture into the the drum screen to separate mixture . Standard material will into the gold seledtion device to select by vibration . non -standard material will into the river by belt convery or other place . all power from generator sets . position use the winch to fix the dold dredger when it is working . |
Item \type | Hull size | Dredging depth | Drum scrren power | Generator power and brand | Dredging power | Lifting power | Chain bucket capacity |
QH-60 | 24m | 7m | 5.5kw | Cumins /75kw | 35kw | 7.5kw | 0.035m3 |
QH-80 | 27m | 12m | 5.5kw | Cumins/75kw | 55kw | 18kw | 0.05m3 |
QH-100 | 30m | 13m | 5.5kw | Cumins /75kw | 55kw | 22kw | 0.08m3 |
QH-120 | 35m | 15m | 7.5kw | Cumins/75kw | 75kw | 22kw | 0.08m3 |
QH-150 | 38m | 18m | 11kw | Cumins /75kw | 75kw | 22kw | 0.08m3 |
1. The dredger could be divided into bucket type and pump suction type. Bucket type dredger is applied for waterways with high percentage of clay and gravels, while pump suction type can only be used for terrains with low percentage of clay and gravel.
2. Customized according to specific requirements for dredging depth and capacity.
3. Iron ore needs to be retrieved first with magnetic separator if the percentage is high in the raw ore, then gold, diamond, zirconium will be concentrated.
4. The dredger is composed of several gravity concentrators. The concentration ratio could reach as high as 1:1000, and the recovery efficiency about 90% after series of separator.
1 |
Profestional people serve the technical consult. |
2 |
All the mining machinery can be coustomed. |
3 |
We are factory which can provide the higher quality and lower price. |
4 |
Offering spare parts at a discounted price. |
5 |
Responsible Sales team design team manufacture team available 24/7 to best serve clients. |
6 |
Free repair if quality problems happen. |
7 |
Provide professional service and providesolution in a timely manner. |
8 |
Free field Installation commissioning training and and free product drawings. |
The dredging bucket rotates around the underwater dredging wheel. scooping up the solid in the riverbed. then trommel classifier. with single layer or double layer screens. will separate the gravels, clay balls. water plants with need sand. The find sand with fine gold & gold nuggests will be finished selection by the gold centrifuge.pulsating sluice box and fixed sluice box. After 3 process of gold panning. the gold recovery percentage can be upto 90%. Our bucket chain gold dredger is very fir for the alluvial sand with gold. If the river sand with a lot of big pebbles. the bucket chain type is one perfect choice. |
Set Sail dredger factory covers an area of 1500 acres with more than 200 employees. |
Factory has manufacture experience more than 20 years. |
More than 50 certificated engineers and technicians. |
We have certification and patent more than 50 item. It contains ISO CE etc. |
Set Sail dredger is sold more than 80 countries . |
1 | the gold particle size in mm? |
2 | if you will require the diesel generator? and any special requirement for the generator brand? |
3 | In the dredging raw ore, the sand & stone percentage? stone's size in mm? |
4 | How many meters for the dredge depth? |
5 | How many cubic meter per hour for the deal capacity? |
1. the max. dredging depth?
2. your required work capacity per hour?
3. ratio of sand and stone? any clay?
4. other special requirements or river terrain report